DC fast charging stations, 20 to 240 kW.
Wall, floor and dual-gun cabinets with OCPP 1.6J, 7-inch touch screen, RFID and QR start, and gun options across CCS1, CCS2, NACS, GB/T and CHAdeMO — including mixed-gun configurations for sites that serve more than one standard.
Choose by site, not by spec sheet.
| Model group | Output | Form | Guns | Typical site |
|---|---|---|---|---|
| VoltDock | 20 / 30 kW | Wall or column | 1 | Retail park, hotel, small depot |
| PineBox | 7 / 20 / 30 / 40 kW | Floor cabinet | 1 | Workshop, car dealer, taxi rank |
| VoltCart | 30 / 40 / 60 kW | Mobile / wheeled | 1 | Events, temporary sites, rescue |
| VoltPost Duo | 60 / 120 / 180 kW | Column, dual gun | 2 (mixed) | Public car park, fleet depot |
| AmpCore Pro | 60–240 kW | Floor, dual gun | 2 | Highway service area, hub |
Model names are our internal families. Final configuration, cable length, gun mix and connector standard are fixed on the project drawing before production.
Common platform parameters.
| Rated input | 380 / 400 V AC ±15%, three phase |
|---|---|
| Output voltage | 200–1000 V DC (constant power range within 300–1000 V) |
| Output power | 20 / 30 / 40 / 60 / 120 / 180 / 240 kW |
| Efficiency | ≥ 95% at rated load |
| HMI | 7-inch touch screen; RFID card, QR / app, plug-and-charge on request |
| Communication | OCPP 1.6J (1.6 / 2.0.1 on request), Ethernet, 4G, Wi-Fi optional |
| Protection | Leakage, input/output over-voltage, under-voltage, over-current, short circuit, reverse connection, lightning, grounding, over-temperature, contactor adhesion, insulation monitoring |
| Enclosure | IP54, -30 °C to +50 °C, altitude ≤ 2000 m with derating above |
| Cable | 5 m standard, 3–8 m optional |
| Certification | CE, RoHS; OCPP 1.6J conformance; country-specific grid compliance on request |
Four things that decide whether the project passes inspection.
1Grid connection and protection
The station needs a supply you can actually get. Send the site's available kVA and the utility's approved protection scheme — we size the input breaker and cable with you.
2Gun standard at the site
CCS2 for Europe, CCS1/NACS for North America, GB/T for China. Mixed-gun cabinets exist precisely because one site often serves both.
3Backend and OCPP
Tell us the CPO platform and the OCPP profile before production. Changing it after firmware lock means a new controller.
4Civil works and access
Cabinet footprint, cable length, bollard position, drainage and lighting. We supply the drawing pack for your installer.
Project documentation pack
With every DC quotation: dimension drawing, single-line diagram, input protection recommendation, gun and cable datasheet, OCPP profile sheet and the certificate list for the exact model.
Lead time for DC: 25–40 days after deposit, depending on power and gun mix. Sea freight is usually LCL for one unit — we quote the CBM and gross weight up front.
Buyer guides for this product line