Home / DC fast charging stations

DC fast charging stations, 20 to 240 kW.

Wall, floor and dual-gun cabinets with OCPP 1.6J, 7-inch touch screen, RFID and QR start, and gun options across CCS1, CCS2, NACS, GB/T and CHAdeMO — including mixed-gun configurations for sites that serve more than one standard.

Discuss a project See power range
Mobile DC fast charging cabinet with CCS gun
Range

Choose by site, not by spec sheet.

Model groupOutputFormGunsTypical site
VoltDock20 / 30 kWWall or column1Retail park, hotel, small depot
PineBox7 / 20 / 30 / 40 kWFloor cabinet1Workshop, car dealer, taxi rank
VoltCart30 / 40 / 60 kWMobile / wheeled1Events, temporary sites, rescue
VoltPost Duo60 / 120 / 180 kWColumn, dual gun2 (mixed)Public car park, fleet depot
AmpCore Pro60–240 kWFloor, dual gun2Highway service area, hub

Model names are our internal families. Final configuration, cable length, gun mix and connector standard are fixed on the project drawing before production.

Specification

Common platform parameters.

Rated input380 / 400 V AC ±15%, three phase
Output voltage200–1000 V DC (constant power range within 300–1000 V)
Output power20 / 30 / 40 / 60 / 120 / 180 / 240 kW
Efficiency≥ 95% at rated load
HMI7-inch touch screen; RFID card, QR / app, plug-and-charge on request
CommunicationOCPP 1.6J (1.6 / 2.0.1 on request), Ethernet, 4G, Wi-Fi optional
ProtectionLeakage, input/output over-voltage, under-voltage, over-current, short circuit, reverse connection, lightning, grounding, over-temperature, contactor adhesion, insulation monitoring
EnclosureIP54, -30 °C to +50 °C, altitude ≤ 2000 m with derating above
Cable5 m standard, 3–8 m optional
CertificationCE, RoHS; OCPP 1.6J conformance; country-specific grid compliance on request
Before you order a DC station

Four things that decide whether the project passes inspection.

1Grid connection and protection

The station needs a supply you can actually get. Send the site's available kVA and the utility's approved protection scheme — we size the input breaker and cable with you.

2Gun standard at the site

CCS2 for Europe, CCS1/NACS for North America, GB/T for China. Mixed-gun cabinets exist precisely because one site often serves both.

3Backend and OCPP

Tell us the CPO platform and the OCPP profile before production. Changing it after firmware lock means a new controller.

4Civil works and access

Cabinet footprint, cable length, bollard position, drainage and lighting. We supply the drawing pack for your installer.

Project documentation pack

With every DC quotation: dimension drawing, single-line diagram, input protection recommendation, gun and cable datasheet, OCPP profile sheet and the certificate list for the exact model.

Lead time for DC: 25–40 days after deposit, depending on power and gun mix. Sea freight is usually LCL for one unit — we quote the CBM and gross weight up front.

Discuss a DC project

WhatsApp instead Reply within 1 business day. No newsletter, no reselling of your data.

Buyer guides for this product line

Selection, compatibility and inspection checklists written for importers and distributors.

Need pricing on a specific model? Send RFQ →