GB/T AC Charging Gun Cable OEM Supplier
GB/T AC charging gun cable assemblies support China-market EV charging equipment and project-specific EVSE integration. Confirm the vehicle inlet, charging equipment, phase and termination before quotation.
Project specification checklist
- AC voltage, current, phase and target power
- Vehicle-side GB/T connector and equipment-side termination
- Cable length, conductor, jacket and temperature requirements
- Charging equipment model and representative vehicle
- Labeling, packaging, quantity and destination-market documents
GB/T configuration control
Identify the product as an AC assembly and distinguish it from GB/T DC charging equipment at the start of the RFQ. Confirm single-phase or three-phase input, vehicle-side role, equipment-side termination and intended charger controller. Review labels and documents for the exact finished assembly rather than inferring them from connector appearance.
Before a repeat order, compare production with the approved sample for connector markings, cable construction, length, termination, strain relief and packing. If the charging equipment or vehicle set changes, repeat the relevant compatibility checks instead of assuming previous validation covers the new application.
Sample validation
Use a representative vehicle and charging equipment to check fit, latch, session start, stable operation, release and cable handling. Keep the approved model and revision linked to production and packing records.
View GB/T cable product page · Review sample validation · Request a quotation